Skip to content

Integrate annotations, switches, and project builds into master - #21

Merged
bytetroll merged 9 commits into
masterfrom
codex/integrate-language-tooling
Oct 29, 2026
Merged

bytetroll merged 9 commits into
masterfrom
codex/integrate-language-tooling

Conversation

@bytetroll

Copy link
Copy Markdown
Contributor

Bring the reviewed annotation (#18), fallthrough switch (#19), and incremental build (#20) changes into master. Those stacked PRs merged into feature branches after their parent PRs had closed, leaving their changes outside master.

This integrates the existing implementations without changing their behavior: shared declaration annotations and Matrix preprocessing, switch statements and expressions, and incremental/parallel project builds with NILData configuration.

Validation: the combined code and subsequent dynamic-value work pass the 529-test CTest suite (528 passed, optional PostgreSQL integration skipped), plus 134 VS Code unit tests, the extension type check, and the production bundle build.

bytetroll and others added 9 commits October 29, 2026 13:59
# Conflicts:
#	docs/design/README.md
#	matrix/docs/next-version-findings.md
Preserve annotation and NILData findings while carrying the current master integration through the stacked pull request. TypeScript checking and all 122 extension unit tests pass.
Preserve switch and NILData findings while propagating the current master integration through the stacked pull request. TypeScript checking and all 124 extension unit tests pass.
# Conflicts:
#	docs/design/README.md
#	matrix/docs/next-version-findings.md
Add incremental parallel builds and NILData project configuration
@bytetroll
bytetroll merged commit 52cc557 into master Oct 29, 2026
7 of 9 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant